A Hackney haulier: no bookings Monday, taking them again Thursday
The call came on the Monday with a rebuild still turning, and the job was moved forward. First thing said: cut the power, and ask the array for nothing else. After that each member got an image to itself, and the reassembly ran on those images, never on the drives. The database came up whole, and by Thursday the firm was booking work again.